Scope baseline
The accepted drawing revision, material, quantity, process, finish, assumptions, exclusions, and acceptance requirements form the job baseline.
Upload & quoteQuality begins with an unambiguous scope—not an inspection performed after the wrong requirement was built. FinalMetal applies project controls in proportion to the part, application, and risk.
The accepted drawing revision, material, quantity, process, finish, assumptions, exclusions, and acceptance requirements form the job baseline.
Production partners are selected for the process, material, geometry, volume, tolerance, finish, timing, and documentation requirements of the specific job.
Files and changes are identified by revision. A revised requirement is reviewed for price, timing, tooling, and work already in progress before release.
Critical dimensions and visible or functional requirements are identified before production. Inspection level and documentation are quoted to match risk.
Color, gloss, texture, cosmetic faces, masking, preparation, and sample approval requirements are established before coating.
Packaging, identification, documentation, shipment condition, and delivery method are checked before the completed scope is released.
Material certificates, first-article records, dimensional reports, weld documentation, coating records, and production photographs may be included when requested and confirmed in the quote. We do not imply certifications or testing that have not been specifically established for the job.